Phase Two – Luxury Development News at Stocks Hall Mawdesley

As promised here is the next instalment of photos regarding Phase Two of the rural build at Stocks Hall Living.

The exciting new Leisure Suite will adjoin the existing 42 roomed Luxury Residential & Nursing Care Home with Independent Living Apartments set in the in the idyllic village location of Mawdesley.

Phase Two incorporates a swimming pool, vitality spa, steam room, sauna room, gymnasium with multi use studio, plus an exterior hot tub and seating area. A licensed Café/Bistro, with an external terrace seating area, plus Health & Beauty Spa facilities with treatment rooms.

As you can see by the photos, the building is really coming along:

👉 The structural concrete basement works, steel frame construction and concrete floors and stairs are now complete.

👉 The 16m x 5m swimming pool and the 5m x 5m vitality spa pool shell construction are complete.

👉 The external scaffolding is now erected and external masonry is underway.

👉 Roof construction will now commence, with the aim to be water tight by early March 2019.

To compliment the leisure facilities, there will be further eight luxury appointed Apartments built, in addition to the 12 already on site, with a dedicated, secure access route for private occupancy.

Completion is scheduled for Christmas 2019.

Follow our Facebook and Website pages to be the first to hear about all the exciting news regarding Phase 2!

Stocks Hall Mawdesley Tel: 01704 778178